How long do I have to wait to apply Armorseal 1000 HS after acid eitching new concrete
I applyed let dry pressure washed and let dry now 8 hours going to try and wait 24 before epoxy goes on
is this enough time>?
TT I am doing my 30x30x12 as we speak a two post lift will be in a bay and cover some light if a car is up so trying to make a good choice on light qty and placement
dont want to highjack tread but I have a 30x30x12 in one bay a 2 post lift will be install about 5 ft from side wall and 10 ft from the rear of shop> i dont want the lights to be cover up by a car on lift and make sure I have enough lits what would you suggest open to all
ummm i need some idea on how to place my rotary lift
I prob should have did the 2 single doors but too late now placement of the lift is got to be on the money thou
figurin maybe at an angle if I go 3 feet from the wall my ent side wall comin in is 8 ft each side with the 14 ft door
if i had a brandnew shop 30x30 I am now looking at a epoxy kit
would the cleaning supplys in a kit such as epoxy coat have everything I need to clean and apply