Recent content by Stnbrgn

  1. S

    26 x 32 Chevelle Shop

    Apron and sidewalk are poured. Tuesday of this past week the guys came back and poured the apron (12 x 26) and sidewalk. They lagged it to the shop floor and put in wire mesh. It has a brush finish and came out very nice. Next on the list is to run a trench from the house to the shop so gas...
  2. S

    26 x 32 Chevelle Shop

    Floor is poured. After waiting about 3 months because everyone is busy, the floor got poured a couple of weeks ago. They picked one of the hottest and most humid day's to do this but the guys did a nice job. There's only one low spot and it's not much to speak of. I had to keep it wet for a few...
  3. S

    26 x 32 Chevelle Shop

    Part of the planning for the shop included a water line. One of our neighbours has a business that involves cleaning sewer lines for towns and cities as well as private companies. His trucks are also capable of hydro-excavating which they also do on a regular basis. The nice thing about...
  4. S

    26 x 32 Chevelle Shop

    Well it's been a while since I last posted. Things have been progressing slowly but surely. As I said in my previous post I installed the lighting. I also ran the conduit and wiring to the lights and down to the switches. I have an extension cord running to the shop so I can plug in the...
  5. S

    26 x 32 Chevelle Shop

    Well the insulation was blown into the attic this week. It's 13 inches thick which translates to around an R-40. I also attached all 18 fluorescent fixtures to the ceiling (haven't got a photo yet). Now I have to pick up the conduit and wire to connect them all together. They'll be on 3 separate...
  6. S

    26 x 32 Chevelle Shop

    Thanks. It was a pretty big job and I wasn't sure how it would turn out, I must say it looks good but who's going to see it after it's covered up. I hope it helps keep the heating costs to a minimum.
  7. S

    26 x 32 Chevelle Shop

    Thanks for the compliment. Can't wait to get the Chevelle in the new shop.
  8. S

    26 x 32 Chevelle Shop

    We were able to get some more done in the shop since my last post. By "we" I mean my oldest son, who spent his days off driving here (about 45 mins.), helping me with screwing the steel to the ceiling as well as some of the vapour barrier on the walls. All the wiring is in place except for a...
  9. S

    26 x 32 Chevelle Shop

    Happy New Year everyone. Things have progressing a little slowly around here since the shell was finished. I had my 2 sons help me with the ceiling vapour barrier during the Christmas, New Year break. We installed 3 separate lengths of vapour barrier then strapped the ceiling for the steel. I...
  10. S

    Advice on insulating polebarn

    Have a look at my thread. I'm not saying it's the way to go but it may help with some of your questions or give you ideas. Here's the link I hope it works. https://www.garagejournal.com/forum/showthread.php?t=375560
  11. S

    26 x 32 Chevelle Shop

    I'd have to mount a satellite dish and run line into the shop for it as we don't have cable out here. As for speaker wire, that's a good idea since it's pretty simple to run with nothing on the walls or ceiling. I just talked to our neighbour today about running a gas line so that's in the...
  12. S

    26 x 32 Chevelle Shop

    Thanks. I agree even though I do say so myself. :lol:
  13. S

    26 x 32 Chevelle Shop

    Yes it has roll up doors and they are insulated. They are a commercial door so they're insulated to an R-14. Your right no point in having an insulated floor or walls with out insulated doors. Speaking of which they've been installed. The shell of the building is done. I've been working on...
  14. S

    26 x 32 Chevelle Shop

    The ends of the shop were clad in steel but the sides couldn't be done until the capping of the doors and windows were done. The capping couldn't be done because the lumber yard couldn't locate the windows that were ordered, so that was about a week wait. Finally the windows arrived on Monday of...
  15. S

    26 x 32 Chevelle Shop

    A lot has happened in the last 2 weeks. The framing was finished and passed inspection. The building was wrapped and the steel was put on the roof. My builder did something he's never done before and that was to work on a Sunday. The forecast was such that it was supposed to be very windy for...