This is a 24K unit, 5th gen going in a metal shop building. Looks like I will need to buy a 30amp fused breaker with cord separately. Does this mean that I need a 30amp breaker in my sub panel, or just a 20amp? Also, is the wire from the sub panel to the outside box supposed to be 10-2 wire or...