  1. T

    Rust Bullet - time between pressure wash and first coat

    Thanks for the replies everyone. Looks like I'm a couple of days away from the first coat.
  2. T

    Rust Bullet - time between pressure wash and first coat

    Is there a recommended time for this? I cleaned tonight and would like to start coating tomorrow or Saturday. Thanks for the advice.
  3. T

    In-floor Scissor Lift Install

    My floor will be poured next week, and I'm seriously considering having it prepped for the Greg Smith lift. I know it specifies 4" conduit, but I have plenty of 3" on hand. Is 4" really necessary? Seems overkill to me, but I'll get if needed. Thanks.
  4. T

    Seeking insulation advice for planned build

    Thanks, that's something to consider and will be discussed with the builder (if I ever chose one) and the insulator.
  5. T

    Seeking insulation advice for planned build

    The idea of simply rolling in insulation and adding the sheathing sounds great, but every time I see commercial/bookshelf girts mentioned, thermal bridging due to the framework is brought up. If a wrap under the sheet metal is an adequate break, what material/thickness is necessary?
  6. T

    Seeking insulation advice for planned build

    Ok, after a week of vacation, another week getting the lot cleared and leveled, and a ridiculous amount of time spent thinking about how I want to do this, it’s time to start making decisions. At this point, I’m pretty set on installing a metal ceiling with blown in insulation on top. I also...
  7. T

    Seeking insulation advice for planned build

    The shell is where I hope to save as much money as possible. I intend to finish everything else myself (except spray foam if chosen). If I had more time, I'd consider stick built doing more of it on my own. Lifespan isn't a huge consideration, as we don't plan to stay here forever (10-15...
  8. T

    Seeking insulation advice for planned build

    Thanks for the responses everyone. It’s obvious I have some more research to do and phone calls to make. I’ll try to respond to everyone’s comments/questions here. Voi – I agree, the ½” rigid foam/radiant barrier can probably be skipped if I’m planning on more serious insulation. I think...
  9. T

    Seeking insulation advice for planned build

    I've been lurking here for years, and it's finally time for a post. Excavation should be done in 3-4 weeks, so it's decision time. I don't have an exact footprint yet (waiting on the clearing/dirt work), but I anticipate an enclosed area somewhere between 30x40 and 40x50. The entire area...