Unfortunately nobody in my area works that way 🙄. They all want about half before the framing is done.
I asked for a price on an electric sub panel. 3k for 100 amp and 4K for 200 amp 😳
Spoke with the contractor and he tells me that the engineer said they had to switch the doors for the gas line, then the guy who dug the footings shows up to get ready to pour the floor and starts apologizing for placing the footing in the wrong place for the doors. Says he didn't look at the...
They poured the footings, but it looks like they put the small door closest to the house? Definitely a wider opening on the door furthest from the house. I'll have to talk to the contractor, who my wife made me hire vs doing it myself.