rpenterics
Well-known member
The first 4 months of a weekend project are always the hardest for me
Looks like great progress! What did you decide on for power?
Are you restricted to a certain height if you fall below the permit process?


I think it's just a thing of getting old. I keep knee pads and a couch cushion around the garage to put down before I get on my knees to work on projects.Good job on the roof! And I hear ya on not liking to work on my knees. Probably why I hate irrigation. There always seems to be something that goes to ****.
![]()
I think it's just a thing of getting old. I keep knee pads and a couch cushion around the garage to put down before I get on my knees to work on projects.
Yea that foam in the cushion really sticks to the roof and it's free!My old neighbor (who works in the trades) pointed out to me one time why, when you see a couch on the curb for disposal, the seat cushions are always missing. It's because roofers grab them.
I've tried using knee pads a few times in the past but found them incredibly annoying. If I was doing something like flooring every day, I could certainly see using them. When I'm on ground level, I just rely on my Slavic heritage and squat.
Roof looks great. If you ever want to come out to Pennsylvania I have a few things that could use a new roof..The roof is done!
![]()
This was the part of the project that I was least interested in. I do not like heights. I do not like working on my knees. I do not like climbing ladders with 70 pounds of shingles on my shoulder. I do not like watching my tape measure slowly roll off the roof when I missed hooking it on my belt. I do not like green eggs and ham. Wait… wrong story.
The weather was perfect for this project. Temps were around 70F, a light breeze, and sunny skies made for enjoyable work outside. The installation went off without a hitch and I’m glad to have this part of the project completed. While I’ve helped with roofs before, this was the first time I’ve ever done a roofing project solo. I took my time, read the manufacturer's instructions, checked the internet a few times when I had a question, and I am happy with the result. The shingles are the same brand/color we had installed on the house last summer, so it all ties together nicely.
As much as I was trying to avoid the expense because I don’t know when I’ll ever need it again, I did end up buying a roofing nailer – a Metabo HPT NV45AB2, currently on sale for $259 (and the 11% Menards rebate). Nice little unit. Besides the time savings, it likely saved a lot of wear and tear on my fingers.
The only real issue I had during the weekend was that I kept having issues with the nails not driving fully into the decking when using the nailer, requiring me to tap in probably half the nails with a hammer. Then I got to thinking, I wonder what the regulator is set at? Sure enough, I’d dialed the regulator down to 70psi for running my air stapler, which is the bottom limit for the nailer to function. Once I cranked it up to 90psi (middle of the recommended range), it ran like a champ. It only took me about a quarter of the shingles to fix the issue. Some saying about needing to be 20% smarter than your tools came to mind. It’s good to be humbled every now and then.
I’m really looking forward to working on the siding this weekend and hopefully getting the shed dried in.
Roof looks great. If you ever want to come out to Pennsylvania I have a few things that could use a new roof..
A friend of mine that did some roofing always made it his policy to take 3 tape measures, 3 razor knife’s and 3 hammers up with him.
Figured he’d save time going down to get 3 tools at once.
Haha, Ranger Rick sounds like a real treat. With guys like that I often wonder if they’re self-aware and if they realize their “helpful suggestions” are received as criticisms. I’ve seen you do nothing but improve both of your houses in that neighborhood, so if he’s going to complain about you of all neighbors, I wouldn’t have much time for that.

Question, do you have any plans for the water run-off behind the shed?
![]()
I've been interested in the LP Smartside panels. After working with the material, what are your impressions? Easy to work with? Does it seem durable? Do you have to use special nails? How do you finish the nails? 6" spacing sounds like a ton of nails! Did you use your new roofing nailer? OK, I think that's enough questions for one reply! Looking good though! Eating that elephant one bite at a time!
Thanks for the lengthy reply! I did Hardie Siding on my garage and there were a lot of places where the nails were exposed. Covered them with exterior spackle and dang did that take a long time. I've been planning a shed build and Smartside is something I'm looking at. This feedback makes me think it's a good choice.It appears to be the same base material used in their other siding products - essentially a very dense OSB type material. It cuts nice with a high tooth plywood blade. No tear out or chips. Any cut edges need to be painted, but that's to be expected with any other siding product. Additionally, you need to leave a 1/8" expansion gap between panels, but that is easy to do because there is a reference line embedded in the finish where the panels overlap.
One thing worth noting - the LP panels weight 9lbs more than the equivalent T1-11 plywood panels, and 5lbs more than regular 5/8" OSB sheeting, so there does seem to be more material in the mix.
Durability remains to be seen, but LP offers a 5/50 year warranty on the product if installed according to their specs - 5 year full replacement cost, 50 year warranty on the product itself. Not being a pro, I'd never be able to cash in on that warranty, but it does give me a little piece of mind that it is out there.
No special nails. They spec a minimum of 0.113 shank hot-dip galvanized with a minimum of 1.5" embedment in the studs for structural use, 0.092 otherwise. I'm using 2-3/8" long nails, 0.113 shank galvanized nails through the 21 degree Maktita cordless nailer to install them. That gives me an extra 1/4" of embedment over the minimum on 5/8" panels. I was only going to do the 6-6 spacing on the corner pieces, but forgot on the second and third panels, so I just figured I'd continue on the rest of the panels. I'll still have nails left over when the project is done, so I might as well use them. The only downside is that I'm constantly reloading the nailer.
Nails get painted over. They don't call for sealing unless over-driven. I've got a few of those on the first panel from when I was dialing in the depth on the nailer, so I'll treat those accordingly. Looking at some sheds outside the big box stores, it appears to be the common practice to just paint them anyway, so I'm not over thinking it.
Thanks for the lengthy reply!...
You can probably relate to this.. I'm a week away from finishing a two month project, in just seven months!
How much light do you get thru the polycarbonate windows?...
...Are you building ramps for each door for the lawn equipment?
While I’m not a big fan of the white paint, painting it a different color seems like a recipe for disappointment when it starts chipping or flaking in a few years. I could have ordered a black door, but the lead time was something like six weeks and it would have cost quite a bit more. White it is.
Tooting my own horn a little, I’ve been pretty happy with my past self on how square, level, and plumb the door openings were (even if one of them was the wrong size). Heck, I’ve been pretty happy with how all the framing ended up, especially being a first timer on an endeavor like this.
No progress pictures for the last few weeks’ worth of work – gotta save something for the big reveal!
Last weekend, I got the soffit installed and painted (used LP’s soffit material that has vents cut into it at the factory). Saturday, I started off by putting a second coat of paint on the soffit and making a material run to get all the boards I should need to trim out the shed. I was originally going to use PVC trim until I started looking at the prices. Good grief they want some serious money for that stuff - just to trim out the shed would have cost over $1k! No thank you. For the $800+ I saved by buying PT boards instead, I’m happy to spend some time painting. Between batches of paint drying, I also got started installing the fascia. It is satisfying seeing the final pieces of the project start going on.
The forecast for Sunday was supposed to be clear, but I woke up to rain, and it rained on and off most of the day. While I could have trudged on by painting boards inside the shed, I was just not up to it. Wife sensed my mood and suggested I just take a day off, to which I agreed with no argument. For the last six weeks, I’ve spent every day off working on the shed and I’m burned out.
I did move a few things out of the garage down to my workshop and brought a load of cardboard to the recycling bin (I’d been tossing some of the larger boxes aside for months now, it ended up being a decent size load). Wife and I then made a Costco run. (I forgot to mention, the kids are on the farm this week to kick off summer vacation.) After that, I tinkered around the basement shop a little. It was a nice, relaxing day. I’m coming into the week fresh for the first time in a long time. I’ll have to see how much progress is made next weekend. I think I’ll be heading up to the farm to get the kids, so I might not get a lot done. However, the end is near, and I’m looking forward to having this shed done.
Are you painting or staining the PT wood you’re using for trim? I didn’t think paint and PT wood didn’t play well with each other.
I know the few pieces of PT wood I’ve used for trim were always stained.
Need to spray paint that thing chrome, put on a black suit ( tuxedo T-shirt for summer) with black sunglasses and you’d be a shoe in for a men in black agentAfter letting the PT boards sit for a few weeks airing out in the shed, Wife knocked out the rest of the painting on Saturday afternoon while I mowed the yard. Of course we were about 1/4 of a gallon short to do everything, but that'll leave us some extra for touch-ups later on. That's about all I got done this weekend for projects. I tool Smasher to a birthday party Saturday morning. It kind of killed the day as far getting anything done was concerned. Oh well.
I know Father's Day can be tough for some people, but I hope everyone was able to enjoy the day. Not that I expect too much, but Wife and the kids nailed it this year with my gift... a ZURU XSHOT Motor Soaker!
![]()
ZURU Toys | Play Reimagined.
ZURU is a disruptive and award-winning company that designs, manufactures, and markets innovative toys and consumer products such as Mini Brands, Bunch O Balloons, XSHOT and more!zurutoys.com![]()
(Wife made me do a serious pose with the squirt gun)
I've joked about picking one up a few times so that I can put Smasher in his place when it comes to backyard water fights. It's a pretty awesome setup. If it holds up as well as any of the other ZURU squirt guns we have, it should provide many years of fun.
I've also been playing around with ChatGPT lately (I know, a little late to the game). I asked it to turn me into a GI Joe toy based on that picture. It did not disappoint...
![]()
Sunday was a chill day for us. It rained most of the day, so it was a good excuse not to do anything outside. Smasher was itching to do some Legos, and he had some birthday money burning a hole in his pocket, so we went to the Lego store at the mall. He picked out a Ninjago kit that he didn't already have. As we went to the checkout, I noticed that they had the Ken Block Hoonicorn in stock, so naturally I had to get it. We had a great morning just sitting at the table and doing Legos together. He's pretty darn good for 6 years old - didn't ask for my help once! I can't remember the last time I did a Lego kit for myself. It's probably been 30 years at least.
So between the squirt gun and the Lego kit, I got to relive a little bit of my childhood again. Not much work got done, but I had a lot of fun just hanging out with the family.