September 18-20 - All of the lights have been mounted. For now, just the first two rows are wired up, as I'll need more electrical work at the rear of the building for an office that I plan to build later. Even without the last row, these lights are super bright! After being in the shop for a while and returning to the house, my eyes need a little time to readjust to dimmer warm lighting. If you get these, I highly recommend putting them on dimmer switches.

Time to connect the water to the shop, and tie in to the septic. Digging up the capped ends.
Tying into the septic.
This line ties into the water line supplying water to the water heater. It was wrapped in insulation before backfilling. They added a shutoff valve just in case
Unfortunately accessing the water heater meant cutting some drywall. The cut drywall was replaced, but I'll have to make it pretty at some point.