Post #0076a - Construction work continues - More progress at accommodation module - Part LXXI
Fitting out the interior kicked off with preparing the concrete slab in the accommodation module for tiling but first up the tiles arrived on site.
Nothing exotic was chosen. A single grey 600 x 600 mm (2’ x 2’) floor tile is used throughout, a small grey and white square tile laid in a checkerboard pattern for the kitchen bench splashback, subway pattern splashback for the laundrette bench and stack pattern feature wall in the bathroom combined with textured white tiles.
All the tiles were selected from
Beaumont Tiles. Looks like those shown are made in China and Vietnam.
Off to a good start. The centre of the room has been identified and tile laying has commenced from the centre and also from a saw cut in the slab.
When talking to the tiler he said the demanding, physical nature of the trade was catching up with him, even though he was only in his late 30s. He’s given up starting apprentices as they’ve all quit in the first week.
Notice how the tiler has only laid two tiles away from the saw cut, so that a walkway is maintained to allow him to keep working towards the sliding glass door.
Next up, the full tiles were laid towards the laundrette. From what I understand, to maintain efficiency, the approach is to lay as many full tiles as possible, leaving the tile cuts to another stage.
Actually, this floor tile was a substitution due to the discontinuation of our first preference.
To be continued.