6 months later and not much visible progress. I have been rotating between plumbing, eletrical, hvac, and framing. I try to do outside work on the weekends and inside work during the week. I am running lights from an extension cord from my house.
Here's some of the hvac ducting (and plumbing). There are 7 registers and I've finished duct work to 4 of them so far. It's been a challenge to do it all without using flex, but I am just stubborn enough to do it. This is my first endeavor into this work. It's alot of fun fitting 12" sections in between the trusses. I roll it up tight so it is only about 6" in diameter, then snap it together once it is in place. The trusses are only 14" tall so only 11" between the top and bottom chord. I will have one section near the air handler that is 14" diameter, so it will be oval shaped, but I won't lose too much volume so it should be fine.
I also added a window above the triple to get more natural light upstairs.
I just installed the first section of soffit, I had to trim 90% of the rafters because they stuck down too low. That was a real pain. I used the oscillating tool to do it. My buddy said a power planer might work better so I'll try to borrow it for the front side.
Finally, set 6x6 posts for the 10' x 20' lean to that will be on the back for kayak and lawn equipment storage.
I am going to try to get siding on it in the next few weeks. It will be hardi lap siding down low and hardi shake up top with a band connecting between the fascia boards along the gable side to separate the two types.