Search results

  1. S

    acid eitching

    How long do I have to wait to apply Armorseal 1000 HS after acid eitching new concrete I applyed let dry pressure washed and let dry now 8 hours going to try and wait 24 before epoxy goes on is this enough time>?
  2. S

    30x30x12 insulation ???

    I have seem to run out and above my budget on my shop for the things I wanted wife added a leintoo 30x10 with concrete and took all the money I was going to use on the insulation of the building the building is being constructed of metal industry Red Iron and Metal. I and wondering what I can...
Top Bottom