hi all,
We're doing a 40x80 with heated floor. In the area where the two post lift will be installed, we dug a couple holes we expect to fill when the floor is poured, thus creating two integrated "concrete posts" beneath the lift posts.
The slab is fully insulated in a "bathtub" and a vapor...