Search results

  1. 3

    My Armorpoxy install

    Spent the weekend emptying out the garage and filling cracks, and yesterday went to work grinding with the 9" Edco unit with the dust kit. Grinding went much better than I had anticipated as I managed to do my 600 sq. ft. garage in about two hours, with another 30 minutes touching up the edges...
  2. 3

    Concrete Patch

    Getting ready to prep the floor for an Armorclad topcoat. Before I grind, I need to patch up this hole and I want to make sure I use the proper material to do so. The area is approximately 6" wide, and probably 1.5" at its deepest. All input welcome, and thanks in advance.
Top Bottom