Search results

  1. K

    concrete curing in pole barn

    just had the floor poured in my pole shed on friday. yesterday they came out and cut the control joints so its pretty dusty on top right now. im wondering if i should be watering it down everyday to cure. my contractor said to just shut all the doors and windows and leave it be for 10 days.
  2. K

    stub in septic and water lines

    im having a pole building shop put up in early october, concreting the entire floor, and i want to stub in septic pipe outlet and water inlet before the concrete gets poured. im eventually gonna have a bathroom with a toilet and sink in the corner of the shop and i was thinking of just putting...
Top Bottom