I am wondering if I'm being too **** with a contractor.
My position is a Resident Engineer overseeing FAA projects.
Project: .5 mile pier into a river
Issue: Shop drawings that were submitted for the 1 mile of handrail note a 0.25 nominall exspansion joint between sections of railing...