  1. T

    Running EMT on Corrugated metal building

    Hello all, I have found a few tips and tricks on here cruzing around on here, but wanted to get some better details. I plan on wiring all my wiring using external EMT, the building is a polebarn, and the floor is not yet poured. I think I will run a larger conduit sub floor, and install a sub...
  2. T

    Above 1200 Sq/FT 45x30 W/Dual Lean-to's

    Hello all, Long time creeper here, and finally am able to post. Started out thinking of 30x30, but everyone says go bigger... so i bumped it out 15 extra feet, and added to Lean-tos. So final dimensions are 30x45x14, 1x 30x12x11 Lean-to, 1 45x12x11 Lean-to, and a 12x16 office on end of lean-to...