I have 1150 sq ft of new concrete floor that I'd like to seal with a clear sealant that provides protection against chemicals (brake fluid), minor scratching, resist hot tire pick-up and leaves a glossy finish. Yes, I plan on waiting a minimum of 30 days after the concrete is poured to apply...