I had a 40x40 shop built. Getting ready to run power to the building. Plan is to set a 90a 2 pole breaker into the 200a house panel, run will be approximately 110 feet to building. I stubbed a 2" conduit when the pad was poured. Also installed UFER ground into the slab. The reading I have been...