X2 on quality vapor barrier and rebar. I used 6” of concrete as was specified by the 12k 2- post lift I put in. Had the lift location determined so not to run the radiant under the lift columns. I placed conduit run under the slab for power to the lift and pulled an extra circuit for 120V...