It's time to upgrade the house to at least 200A and run 100A to a garage sub panel. Turn key should be less than 2K. A lot less with BIL doing the trenching. You can lay the wire, and run it into thr house and garage. Leave the trench open til the electrician does hookup and it's inspected.
I...