Search results

  1. M

    Thoughts on slab moisture issue

    I have a new house with walk out basement. 1/2 the basement is unfinished (the part that is fully underground) and this is my mechanical room it is roughly 15' by 60' with a sump pump near the center of the long side, and against the framed bearing wall (so 15' off the exterior wall). There is...
  2. M

    Garage and Workshop coating suggestions - new slabs

    I have new construction - slabs poured about 5-6 months ago, and I should be ready to tackle the floor in the garage and workshop in a 2-3 months - waiting on construction to complete, and some other projects to finish. I have read many of the floor coating sites mentioned on this forum, and...
Top Bottom