I have enough 10/2 and 14/2 left over from other stuff to wire it all up, so that's covered. I ran 8/3 from the main for about 30 feet to the compressor. The switches only have runs of about 10' each......got lucky on the placement of the compressor, with my basement workshop in the next room...