Search results

  1. J

    How to fill a gap between Grade beam and wall

    So I've built a 28x24 garage and it's turned out great so far. The only thing that is a little irritating, was the guys who poured my grade beam, poured one place an inch low.. I've shimmed the garage, but this leaves a gap. When I start my siding, i'll have to start at the base of my wall...
  2. J

    Back fill or pilings for my garage?? i need advice!

    Hello everyone, I am in the process of building a 24X28 garage in edmonton ab. Unfortunatly when I went to get my permit, a red flag came up and I had to get a geotech in to do some soil samples.. To make matters worse, they told me i have 5 feet of soil before I reach clay.. SO the question...
  3. J

    back fill or pilings for my garage?? i need advice!

    hello everyone, im Jared, and venturing to build my first garage. I live in Edmonton AB cheers
Top Bottom