I need to know if this plan is doable,
I have a 30x50 post beam building that I am currently installing lights in. I have 10 T8 fixtures which hold 4 bulbs each.
The power source is in 1 corner of the building and the switch will be at the other, so I ran power to a jbox and brought 2 lights...