Search results

  1. R

    200 amp service load ?

    If the shut off breaker(some breaker just after the meter) is 200 amps would code allow wiring a 100 amp sub panel and a 200 amp main panel?
  2. R

    Can the house be the detacted building?

    Built a garage 70 feet from the house. The service pole is now next to the garage connected to the house by a over head that crosses the yard and the corner of the garage. I want to move the meter from the house to the garage and connect the house by an underground elimitating the overhead...
  3. R

    24 x30 garage build in michigan

    Here is my build I was limited by code to a 720sqft, 14' midridge height. Oh well! Garage will be a 24'x30' vaulted ceiling with attic storage. Car lift of course, with a 8x7' side garage door for most recent car project and 10x7' carriage doors on the end for main doors. Did not install a...
  4. R

    Checking in for required intro

    Here is my build I was limited by code to a 720sqft, 14' midridge height. Oh well! Garage will be a 24'x30' vaulted ceiling with attic storage. Car lift of course, with a 8x7' side garage door for most recent car project and 10x7' carriage doors on the end for main doors. Did not install a...
Top Bottom