Search results

  1. T

    New garage slab with latex paint overspray, spots, drips

    We have a new 24 x 26 stick framed attached garage and breezeway addition that is just getting finished up, been underway since March. The contractor installed helical pilings with a steel/concrete grade beam down the middle, poured footings and the inside slab in early April when it was still...
  2. T

    Liftmaster 8500's for 2 doors

    I just bought 2 Liftmaster 8500's for the 2 new doors being installed Friday, but I've always had only one door before, so one opener/keypad, etc. With 2 openers, do you need 2 keypads (377LM) or can 1 be programmed to open either door? I read the manual and it isn't mentioned there. Do you...
Top Bottom