Search results

  1. T

    Considering 3 Phase...

    I have an old 7,000sf industrial building that's getting re-wired and re-plumbed and so forth. The building was badly flooded in an accident, so everything below six feet is 'mandatory replace'. This includes the outside disconnect and meter pan, and 2 of the 3 inside subpanels. The previous...
Top Bottom