I had my concrete pad poured just over a week ago.
Here are the specs:
30x40
4" minimal depth (it's way deeper than in most sections)
16" footers with continuous rebar
12" deep where the lift is planned to be installed
3600 PSI fiber reinforced concrete
While stopping by and watching the guys...