Search results

  1. S

    proper prep for epoxy

    The slab is a 3000 PSI mix over a 10 mil visqueen vapor barrier. It has a power steel trowel finish & was poured about three months ago. The building was recently finished & I have been shopping for an epoxy coating contractor. A contractor's recommendation was to apply a moisture barrier...
  2. S

    Lighting for steel RV garage/shop

    My RV garage/shop is up! :rocker:It is a 44x56 steel building with 16' side walls. There are three bays, each accessed thru 14x14 roll up doors. I can now turn my attention to lighting. I was thinking about using 8', 4 tube, T8 fixtures. Each bay would be on it's own switch so it could be...
Top Bottom