I have a typical stick framed shed. Existing floor is 3/4" PT ply. I want to beef it up a bit with a layer of 1/2" ply. I have read lots of posts arguing both sides.
I understand that underlayment as an assembly for things like tile should not be fastened to joists to help decouple from framing...