Hey guys,
I'm pouring a ceiling out of reinforced concrete supported by cinder blocks on all sides. Reason being is that the project should be underground and as such needs to be able to hold a lot of weight (including potentially a vehicle). The longest span is only 14 feet or 4.25 meters...