Search results

  1. H

    Here's my "man cave".

    It's not finished yet. Electric is 85% done. Still waiting for a heating/cooling guy to get back to me so that's up in the air (no pun intended). I'll probably epoxy the floor with U-Coat-It in the Spring. Installing 4 pair of 8" speakers in the ceiling (4 and 4). I will have it rocked and...
Top Bottom