Sorry if this has been asked before but I was unable to find the answer so I figured I'd just ask.
My plan: Upgrade my current service entrance from 100A to 200A using a meter/main combo. Replace the old 60A fuse (yes, fuse) box with a breaker box as a sub-panel from the meter. Install a new...