We have to pump the concrete up for my slab. The pump cannot use 3/4” aggregate. I’m stupid on all things concrete so I thought I would post on here to get opinions.
Everything that I have read is saying that 1/2” is “stronger” though not by much. Is that correct? Is there anything I need to...