Hi guys,
I'm starting a new garage/shop build soon. I'm being held up by DDES permits but it is just a waiting game. I'm building a 30 X 38 1.5 story shop. It will have radiant in-floor heat, electricity, natural gas, water, cable, network, and whatever else I can decide to bury in the trench...