Search results

  1. J

    Filling in Large Holes before Epoxy

    I have 2 slabs of concrete (joining buildings) that were separated with a 2x6 and some 6x6 posts. I have removed the 6x6 posts and the 2x6. I now have a 1.5 inch gap and some 5.5x5.5 inch holes to fill before epoxy. What is the best way to fill the holes? I assume if I use a bag of concrete...
Top Bottom