INFO:
I need to run two hots, a neutral, and a ground 257' from the pole to my new shop through buried 2" schedule 40 PVC conduit buried 5'. Obviously I have to add 5' of wire on each end due to burial depth, and probably another 7' on each end to terminate in the boxes for a grand total of...