I will be using a solvent base epoxy on my 480 sq. ft. garage. I have 3 gallons of epoxy and 1.5 gallons of the hardener and will be applying 2 coats.
So, that means each gallon (mixed with both parts) will cover 210 sq. ft.
Is this enough? I have no clue how thin it will dry with this...