I am trying to draw up a plan so I can pull a permit to run a feeder to my pole barn and have a few questions.
I am trenching in 2" pvc conduit, total of 200 feet with 2 45's in the mix to feed 2-2-2-4 use-2 aluminum in it.
I plan to feed it with a 50 amp breaker to a 100 amp breaker in the barn...