Search results

  1. H

    Balancing temperature between two floors

    The company that I work for has a two-level office. The furnace is installed on the second floor and uses the plenum between the upper level floor and lower level drop ceiling as the air return. There are two 2x2 egg crate tiles and one 2x4 egg crate tile to facilitate air return. The problem...
  2. H

    Astro 9509 Go-Through Screwdriver Set

    I purchased an Astro 9509 Go-Through Screwdriver Set due to the high reviews on this forum as well as other reviews online. I have to say, they are great feeling screwdrivers. They are very heavy, and have powerful magnetic tips. One thing that I found concerning is, upon close inspection...
Top Bottom