I am planning a total interior transformation of my toy storage/shop/man cave. It is a ~20 year old shop building originally built by a ready mix company. It has a flat concrete floor with 8-10" metal squares poured in the floor about 12 feet from the edges. It has pre-stressed 4" thick concrete...