My slab and ground work was 50K, Building 66K with insulation and garage doors, Local company charged 25K to put up. So 141K for building. I installed garage doors. My lumber package was 17K 2x6x9 walls osb all the way around. TJI joist for second floor. We did a the work. Had a plumber...