Search results

  1. C

    Above 1200 Sq/FT His and hers

    Some interior stuff getting installed.
  2. C

    Above 1200 Sq/FT His and hers

    Starting to fill er up. New cabinets came and installed. It’s been great
  3. C

    Above 1200 Sq/FT His and hers

    Well folks. The contractor left yesterday so it’s officially ours. Time to enjoy and live our future in this new space. Very satisfied with the results. Thanx for tagging along with the posts. cheers.
  4. C

    Above 1200 Sq/FT His and hers

    Here’s a night photo as outdoor lighting was installed today.
  5. C

    Above 1200 Sq/FT His and hers

    Here is the latest. Garage doors installed! Wired. Added plug for Sonos amp, siding now on and painted. today was exterior lights. getting very close to completion.
  6. C

    Above 1200 Sq/FT His and hers

    3 doors up today. Siding is also going on.
  7. C

    Above 1200 Sq/FT His and hers

    Garage doors arrived. I will post pics at the end of the week. Interior build out is on going. Wife’s display wall done today.
  8. C

    Above 1200 Sq/FT His and hers

    Some more details going in.
  9. C

    Above 1200 Sq/FT His and hers

    Move in day. Still waiting on garage doors to be installed next week.
  10. C

    Above 1200 Sq/FT His and hers

    Interior doors today. Very happy with them.
  11. C

    Above 1200 Sq/FT His and hers

    Top seal coat tomorrow.
  12. C

    Above 1200 Sq/FT His and hers

    Epoxy floors going in and garage bays. Polished cement in work bay.
  13. C

    Above 1200 Sq/FT His and hers

    Today was project fire place
  14. C

    Above 1200 Sq/FT His and hers

    She is black.
  15. C

    Above 1200 Sq/FT His and hers

    That latest photos.
  16. C

    Above 1200 Sq/FT His and hers

    Painters finished up the ceilings and interior walls. garage has plywood on lower 4 ft. (gray) Border trim to go on. Interior doors, and some lighting to be installed.
  17. C

    Above 1200 Sq/FT His and hers

    Here some updated shots., tape and dry wall finished today. Painters later this week. It will be painted plywood on the bottom 4 feet in the parking areas. Garage doors back ordered so just horded in for now. Studio area with no drywall on it will be shiplap. Metal roof on ends. Shingles...