Search results

  1. D

    Sealing my new floor

    Kicking up and old post. Did you ever use the StampShield to seal your floor?
  2. D

    200 Amp Service - Overhead - Horizontal Tubular Building

    Update : so I have decided to run a lift pole and the weatherhead/mast and meter will be on that pole. Then it will go underground to the garage (only about 8’ away from where we will set the pole). I decided I didn’t want to have to attach it to the garage and have to penetrate to roof for it...
  3. D

    200 Amp Service - Overhead - Horizontal Tubular Building

    For the inside breaker box, or for the weatherhead mast? Between the legs? The spacing is 5’. Or could a 6” piece of unistrut be screwed into the siding on a single leg, and the mast be attached to that with some sort of a clamp?
  4. D

    200 Amp Service - Overhead - Horizontal Tubular Building

    Hello! I am about to get service run to my tubular garage with horizontal siding. Does anybody have pictures of how they mounted the mast/weatherhead as well as the meter box? I don’t have girts to attach to like a vertical siding would have. Just curious on how other have done this. Would it be...
  5. D

    Running 100amp Sub Panel to 30x50x14 Metal Building

    Somebody with a separate meter for their home garage - can you share about how much kWh you use per month, and about how often you’re in the garage? I know everybody is going to be different, just trying to gauge usage. (If someone with similar setup to what I’m wanting has an estimated kWh...
  6. D

    Running 100amp Sub Panel to 30x50x14 Metal Building

    Thats what I was curious to hear - cheap for the 200 amp service. Of course I have the electrician part to pay…
  7. D

    Running 100amp Sub Panel to 30x50x14 Metal Building

    I am in New Mexico! For the first few years, I feel like I won’t be in there much. It’s really to just work on my personal vehicles - and old vehicles that I have.
  8. D

    Running 100amp Sub Panel to 30x50x14 Metal Building

    Hello. I’ve been doing some research but am still confused and I think a post directed to my situation might give me more answers. I have a 200amp service to my home. I built a 30x50x14 tubular garage and was planning on running a separate 200amp service to it. I’m now wondering if I should...
  9. D

    My modest dream come true

    Hello! Came across your shop build. Looks awesome! Just curious - you mentioned that you might have brought the leg spacing in? Are they now 4’ on center or 5’ on center? Also, how did you plan your lift location? How has it worked for you? If it’s worked well in that location, would you mind...
Top Bottom