Here are some pics. I put a plate under the pipe. Used 8inch bolts thru the floor joists since there were 3 boards together which meant I had to go thru 6inches. I wanted a thick pole support but could not find a 2 inch so I used a 2 and 7/8 and added some metal shims. I figured the water...