MrBreeze
Well-known member
As part of a new home construction, a 4" slab was poured less than 2 weeks ago. Then the bright minds decided to remove the 30 yard roll off dumpster filled with waste rock, fill, concrete, brick...no doubt 20,000 pounds by itself...across the newly poured driveway and sidewalk and creating hairline cracks (that of course go through the entire slab)
Rather than replacing those sections, the builder is skirting by saying that it is "within tolerances" and "the cracks are so small, any thin we attempt to do will make the appearance worse" (as if they were going to fill the cracks)
With this part of Arkansas being in a frost zone, I'm pushing to have a 2 year warranty so that the slabs will have multiple freeze/thaw cycles.
I feel I should not have to accept a cracked driveway and sidewalk and they should re-pour. Since they aren't budging, I'm asking for a warranty. Am I being unreasonable?
Rather than replacing those sections, the builder is skirting by saying that it is "within tolerances" and "the cracks are so small, any thin we attempt to do will make the appearance worse" (as if they were going to fill the cracks)
With this part of Arkansas being in a frost zone, I'm pushing to have a 2 year warranty so that the slabs will have multiple freeze/thaw cycles.
I feel I should not have to accept a cracked driveway and sidewalk and they should re-pour. Since they aren't budging, I'm asking for a warranty. Am I being unreasonable?
