I FINALLY BUILT MY STAIRWAY…
The stairs is not finished but is functional for now. This is the start of a major project inside the shop area that includes an upstairs enclosed office and a post-mounted jib crane. More details of the overall plan can be found in post #57. No more struggling with trying to carry things up and down a ladder. The water heater and sink will remain under the stairs. There’s also room for a small fridge, entertainment command center, and clothes washer (for the grimy shop rags) under there.
EDIT:
Total rise on the stairs will be 119". Here are some details:
AND THE OVERHEAD CRANE IS NEXT…
I selected a 1 ton jib crane with a 10’ long I-beam and the attached plan view shows the sweep. I just couldn’t fit the 12’ version as it would hit the column across the bay. The 10’ crane still gives adequate coverage over the main work area. I don’t really intend to lift 2000lbs with this thing but maybe up to 1000 or so. Even with only 1000lbs being lifted, the crane will be exerting about 4000lbs of pull on the top wall anchor. This is going to take a little bit of engineering. A post will span from floor to ceiling at the spot marked at the base of the stairs.
A FEW MORE FEATURES…
The office and stairs will be totally closed in. The wall just to the left of the stairs will have a pocket to store plywood sheets hidden out of sight. The plywood will rest on its 4’ edge in front of the laundry sink and then slide into the wall pocket until it bumps up against the crane post (you can see some framing in the plan view). There will be a door at the base of the stairs to keep dirt/dust out of the stairway while performing messy jobs. I would love to make this a pocket door as it may be open most of the time, but I would have to cut into existing framing and drywall and this project is big enough as is. There will be another door at the top of the stairs (that one is shown) going into the office. There will be quite a bit of storage above the stairway, accessible from the office (I’m trying to use all of that 20’ of ceiling height, of course). Lastly, the walls will be finished off to match the rest of the shop – aluminum tile panel up to 8’, checkered flag from 8 to 10’, vinyl siding on up to the ceiling.