The Horsepower Barn - 52x60 Shop Build

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
I've been into cars since I was 16, with the obsession growing year by year, and spent plenty of time wrenching in apartment parking lots, but always knew that I wanted my own garage or shop. When I and my then-girlfriend (now wife) decided to move outside of town six years ago, we started looking in the mountains west of Denver, but quickly found that the population density was too high and the potential for having a shop building and a garden were not great. We ended up picking up twelve acres on the plains about an hour southeast of Denver, with plenty of room to build both a shop and a garden. I painted a car and did plenty of wrenching in the 30x30 detached garage that was already in place, but as her desire for a woodshop grew, we decided that I needed to have a big shop building so we could both pursue our hobbies without trampling all over each other. Finally, in early 2013, I lined up the money and pulled the trigger on a pole barn package from Hansen Pole Buildings (www.hansenpolebuildings.com). After checking out as many buildings as I could in the area, I decided on a 40x60 with a 12' overhang running the length of one 60' side, for a total of 52x60 (3120 sq ft) under roof.

The build began for real in late May 2013, with my buddy doing the site prep. Began with grubbing the organic surface off of the area.
122g51x.jpg


Brought in two dump trucks of road base.
2e1drm8.jpg

118fvi0.jpg


The site looks flat, but actually had about 10" of fall toward the far end. Fortunately we were able to generate our own fill by digging down in the middle of the field.
2nbtx12.jpg


Where'd the tracksteer go?
2960qy8.jpg


Grading, grading.
w70i28.jpg

27xp8up.jpg


Checking the grade.
imi26b.jpg


Trackpacking as a final step.
1zcmx6t.jpg


A couple days later, the steel showed up on the coolest truck I'd probably ever seen. The canopy rolled back and the crane folded out, and it was ready to go.
2v8pee0.jpg

20prps0.jpg

2eoefwo.jpg


Doesn't look like a building.
2m81l5j.jpg


The lumber truck showed up the next morning with everything but trusses. There were a *lot* of boards here.
2hfrksh.jpg


And then the truss truck finally showed up. There was almost a week's delay due to poor communication on their end, but they finally came down from Wyoming on the roller truck.
2m4xi03.jpg


I was a little trepidacious about just sliding them off and dumping them on the ground, but it's an acceptable method and seemed to work just fine.
2vcti5h.jpg

33uwpqb.jpg

2a9a3oz.jpg

rkwhhs.jpg


Then it came time to lay things out. Apparently it's a good thing when your building is square. :lol_hitti It was really windy while my wife and I were doing the string lines, so we actually did a fair amount of it at night when the wind died down. Frustrating, but it worked.
s46ezd.jpg

ofcxp2.jpg

2mmfv5y.jpg


Headed into town to rent the augers for the column holes, as well as a couple of tall ladders from work. Right around now was when I started to realize that as great of a truck as my Tacoma was, it wasn't quite big enough.
dfjarq.jpg


The augers, along with the neighbor's skidsteer. I believe they were 18", 24" and 36".
2n67w4h.jpg


Laying out column hole locations.
wi33ia.jpg


These holes ain't no joke, especially in this prairie hardpan clay. The big ones took a couple of hits and being easy on the auger throttle, but it got 'er done.
2j5gumt.jpg


One of the holes was apparently in the way of an ambitious vole, who dug right through the wall and landed in the hole.
123oaia.jpg


The dog was enthralled.
2hh14c5.jpg


Look at the digging claws! Very impressive. Unfortunately, they don't do much against a border collie mix who wants to play.
2aify4l.jpg


Enough vermin shenanigans. Time to lay out some columns! Many thanks to my neighbor for the loan of the reachfork.
16b0mz9.jpg


The wife tacking on cross supports. These will reappear later as roof purlins.
oh2pzl.jpg


Getting there. Look at the squat on the Taco, with a bed full of purlins. Truck is just too small for a place like this.
28hfo5w.jpg

35n9cbb.jpg


At least they're straight!
dxmkjs.jpg

jhtyr5.jpg

xlwg04.jpg


And they're all up! Like a forest of milled timber. To the right, you can see the shorter columns that will support the roof overhang. Overhead door will go in the front.
2u7ubo8.jpg


Goin' muddin'.
r9olqt.jpg


A gaggle of columns in curing concrete.
33jikqh.jpg

2jcsphz.jpg


It's a big step in the right direction, and deserves a delicious summer beer.
2mx29o0.jpg


Supports removed, skirt boards in place. Lots of time with a rented transit level to get the skirt board lines right.
2i1cx.jpg

2iubxfl.jpg


Due to the skirt boards, now was the time to drill the holes and insert the rebar hairpins for future concrete.
2el5etd.jpg


Trusses in a bundle on the ground.
30bmzgj.jpg


First end truss going up! You can see the purlin brackets in place. Those were a lot easier to put on on the ground, but still a giant pain in the ***. Four nails from the palm nailer, per bracket, times 20 or so per truss, and they had to be measured perfectly off the ends of the truss. We got the hang eventually, and the wife did a lot of them because it was ground work, but time consuming to say the least.
szg3dj.jpg


Look at the slack in the straps - it's sitting there supported, like it should be.
vru16c.jpg


A thing of beauty.
2uol378.jpg


Just a taste of the weather we got that summer. It seemed to rain only on the weekends, when I was working on the building, and would pour torrentially in the afternoons, leaving a base of greasy mud in which to try to stand on a 12' ladder. I even got the reachfork stuck once. Also take note of my recently reacquired '86 SVO, which I had sold several years earlier but which had just popped back up on eBay. I couldn't resist.
9ktbah.jpg


Look at those sodden ruts. :(
n21j5f.jpg


After a ton of time flattopping a 12' ladder while juggling a palm nailer and trailing an air line, and a couple of weekends of assistance from some good family friends, all the trusses were up and bays were filled with purlins. There are a *lot* of purlins, every one with four nails holding it at each end into a bracket, itself held to the truss by four nails. Mofo should not be coming apart any time soon.
257opwl.jpg


Not bad for a phone picture.
2ztedsm.jpg


I wish I had more pictures of this part. Squaring the building took a lot of straps and even more measurements. I had a long cable with a strap at the end going from corner to corner across the roof purlins as well, to take up any misalignments in the diagonals. It took me a few evenings after work to get it all dialed in, but I felt pretty good that I never had more than a 2" difference in square across the roof.
28spxfo.jpg



Did I mention that we were also planning our wedding during this summer? Asked my lady of nearly five years to marry me in May, and we set the date for September 7th. "We'll have the shop done or nearly so, and it'll be a great place for the reception. No problem!" Well, naturally things took longer than anticipated, as they tend to do, and a couple weeks before the wedding, we still didn't have a roof on the building. My parents were hosting the wedding at their place in the trees, and we needed at least a roof for the reception at our place, so my dad hired a few guys to help us with the roof.
20af6he.jpg

hsrs40.jpg

s3dmq1.jpg


And it has a roof!
35t9z.jpg
 
To avoid these ads, REGISTER NOW!
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
We also really wanted at least a little bit of wall to provide shelter from any wind, but I had a couple of work projects that I had to focus on, so we hired the same guys. They failed to put up the insulation, and the steel shipment was actually short one panel (which Hansen made right immediately), but we had a shelter wall for the wedding reception.
34zimc9.jpg


Couple of pics from the wedding; first one from me as we rolled up, the others were obviously professionally done. ;)
nlvh4w.jpg

2mpybu9.jpg

2r47kgn.jpg


With all that over, and very successfully at that, it was time to get back to it. Overhang/soffit and trim took some puzzlement and careful climbing, but it came together.
in7hmx.jpg


Started in on some wall steel.
dnh9gi.jpg


Wife and I put this wall up in two days by ourselves. She's 5'3" and the longest piece of steel was almost 18 feet long, so it was interesting, but we did it.
2mosemx.jpg

5eh1eu.jpg


With that success, I moved on to the overhang wall. I don't have any pics, but that walk door was framed in and set in concrete in the meantime.
30iuhi1.jpg


Starting to look like a real building!
oa0i0h.jpg

ptvzk.jpg


I started moving a few things inside, like the motorcycles.
1zzkec3.jpg


Got rolling on the front wall steel.
1055c8x.jpg


I ended up redoing the wall that had gone up before the wedding, due to the missing steel (which had showed up long ago, thanks to Hansen) and the absence of the bubble insulation that was supposed to be installed at the same time. I basically reinstalled the whole wall myself. It was around January at this point; check out the sloppy mudhole that I'm working in.
ddi3hc.jpg

v4peo3.jpg


Beginning the eavelights. They're crucial to a building like this, IMO; I love the natural light they provide.
2e5ljjl.jpg


What the hell? Turns out you're supposed to stretch the eavelight panels as you go, but the destruction manual did not mention this. Hansen took pity on me and sent out another panel so I could finish my run, but the lines don't match up with the steel because I failed to stretch the polycarbonate properly. Lesson learned for the next one. :thumbup:
5yds2g.jpg


Looking good!
j8iges.jpg


Time to start parking things inside!
11vmgyr.jpg

wkftef.jpg


Got the overhead door put together. First time I'd done one, it took about five hours by myself. Much easier than I thought it would be.
2ms3clt.jpg


All this time the ridge was open and tended to leak. Time to fix that.
2r5erf4.jpg

23vdw8.jpg


It looks wavy as hell in this picture; I didn't realize it looked like that haha. Looks fine from everywhere else, though.
2ij5b9f.jpg


Corner trims.
wi62ig.jpg

29fe2x4.jpg


New daily driver TDI and the 12v Cummins that replaced the Tacoma. Take note of the extension cord from the garage that powers the shop at this point.
2vipgzr.jpg


Inadequate power notwithstanding, it's finally able to be used as a real building.
333wjg0.jpg


Fast-forward to September of 2014. Got everything together to run real power to the shop itself. The utility came out and upsized my transformer, and I got a game plan and materials for the service extension to the shop.

Long way to go! 170 feet or so, if I remember right.
264gz7q.jpg


First I rented this trencher from Home Depot.
10zz6t0.jpg


Got it home and it would barely scratch the surface of the prairie clay. I think I got three inches deep. Took it back to Depot, 45 minutes away, and got the real deal.
2qu6u7k.jpg


This one carved right through!
i5nkt0.jpg

24omx02.jpg

2niqn92.jpg


All the way through to the outside.
4h4bxy.jpg

29lxoao.jpg


Got all the PVC laid into the trench, and pulled in the 4/0 aluminum feeders. I'll just say that my buddy's truck played a hand in the wire pull.
2e3mp81.jpg


4/0 (four-ought) is no joke; I don't have small hands.
dfuek7.jpg


29613ir.jpg


Into the panel.
2im2v4l.jpg


Time to make it up on the hot side. Scheduled a service outage with the utility at 0900 and an appointment with the inspector at 1500. Without his signoff, the utility wouldn't turn my transformer back on, so I had to get it right.
2jcttzd.jpg


I cut in an enclosure and tied the old conduit to the house and the new conduit to the shop into it.
2qjae7a.jpg


You don't use wirenuts on something like this.
eslrbc.jpg


Looks professional! Technically I am a professional, but since I specialize in low-voltage, I'm pretty proud that the big stuff comes out looking nice as well.
34947f4.jpg


New enclosure to old meter housing.
2wnyf04.jpg


Gonna leave a scar....
16c4105.jpg


Obviously the inspector liked my work, because I have power again. Perfect!
30aewdt.jpg

6to4r6.jpg

213gqj6.jpg


Salvage lighting fixtures that I got for free. Had to re-ballast to 120v from 277, but still not bad. Wiring isn't finalized in this pic.
15fivzo.jpg


Not a bad piece of pipe to one of the three-way switches. The plan is half the building's overhead lights on each switch, and the side walkdoor has a pair of three-ways as well.
n46yhh.jpg


I work in the commercial world, so naturally I've got everything in my shop in conduit. Overkill with the Unistrut rack, but I'll end up running air lines and such on it as well.
nvnyhx.jpg


Finally some useful lighting.
xpr71g.jpg


I still need to upload more pictures, so this will do as a teaser. I've had some issues with drainage, water entry, etc., so ended up saving for a concrete slab for a long time.
2d975dy.jpg
 

Stinger

Well-known member
Joined
Jul 20, 2009
Messages
839
Location
Basehor, KS
Wow, the SVO caught me off guard! Looks like a damn nice shop and even better that you built it yourself. Congrats!
 
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
Haha hi Shannon. Same one that replaced my red 2.3T swapped '92 hatch that got hit. I don't think I still have the downpipe that I picked up from you at WFC, though.
 
Last edited:
To avoid these ads, REGISTER NOW!

matt_i

Well-known member
Joined
Mar 14, 2008
Messages
10,755
Location
SE Michigan
Very cool! I don't see that many pole barns self-built, congrats on what I perceive is a very good job :thumbup: you will have to prioritize getting some concrete lest the building collect too much stuff :). But, it's only natural once the roof is on. Don't ask me how I know...
 

MagKarl

Well-known member
Joined
Oct 15, 2012
Messages
684
Location
Olympia, WA
Nice job, it's a ton of work to do yourself. I have a Hansen building as well and I'm over 2 years into the build and almost done.
 
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
Sorry for the lack of updates. I appreciate the comments and kudos! It's been a labor of love, as carpentry is not my strong suit nor passion. Keeping my eye on the goal of being able to work on cars better and easier is what keeps me rolling.

Several of you commented that I should get a real floor in before too much stuff accumulates. Yeah...about that.... I accumulated plenty of stuff in the intervening couple of years after I got power to the building. :eek:

This was only a month or so after I got lights up.
rj1gnn.jpg


Got some more electrical done overhead.
29ma7up.jpg


Fast forward a couple of years to the way it was by this past summer.
2jciikn.jpg


I picked up the white SC for cheap early this year. It's a five speed 2JZ hardtop (no sunroof) with 135k in great shape; the kid had jumped it over a concrete median and shattered the subframes, so I got it for less than a grand. Junkyarded replacement subframes and oil pans and got it put back together. Not super fun grubbing around on the dirt floor, though.

2ur450i.jpg

24bvjpg.jpg


Check out all the **** scattered everywhere. :(

But, this past summer, we finally got the money together for a slab and got it scheduled, so I had to start clearing it out. I moved the leftover building steel outside, threw away a ton of stuff, and managed to fit most of the rest under the overhang.

5x2wk6.jpg

2809j6.jpg

5czh1l.jpg

f3t37a.jpg


Got it all cleared out (except the **** on the wall girts/"shelves" :eek: )! Concrete guy came out and laid rebar with the coolest wire-tie gun I've ever seen, but right before he did that it dawned on me to run a couple of underslab raceways.

jpvojl.jpg


Just a pair of 1" pipes from right under the panel to the far corner of the shop. I admit I didn't plan it out that well, since the idea dawned on me the day of the rebar drop, but I'm sure I can save at least a little bit of overhead rough. Maybe my compressor will go in that corner, not sure.

I wetted the dirt down the night before so it didn't **** all the moisture out of the concrete.
eqxd2o.jpg


Along with the rebar, he dropped off a chunk of sonotube. They ended up cutting it up into half-moon sections and placing them around each column to try to localize any cracks off the 90* corners.
2eed6on.jpg


Morning of July 23rd, 2016. Concrete pump showed up first so they could get mud to the far end of the building.
2vw7mf6.jpg


Hose laid out.
5o6s75.jpg


Lots of activity for 0700 on a Saturday.
64ii2s.jpg


First mud! It's really happening!
72q9vb.jpg

25p6zag.jpg

6svort.jpg


Here's the sonotube section. They say they've had great luck with it. The top of the tube is just below the surface of the concrete, so it's not visible now, but that layer is so thin that any cracks coming off the column corners (and 90* corners will almost always crack) should travel to the tube and then stop on the rounded surface. Time will tell.
71slmf.jpg


Screeding and floating already.
wijxcl.jpg

2rqivtl.jpg


Only halfway there, but it's a ton of mud. Took the better part of four trucks.
2cyrv9u.jpg


Perspective shot, just because.
1jthms.jpg


The pump was working so well that they just kept shortening hose and used it up until the end.
537jmw.jpg


Finishing, round one:
2wdq4na.jpg

fbi2wn.jpg


Finishing, round two (or three, I forget):
2my57xy.jpg


Looks like a lot of texture, but it's really a lot smoother than it looks.
dcv6af.jpg

351g96u.jpg


Spraying sealer/curer.
2mnot9d.jpg


Fully sealed.
jtmix3.jpg


I kept it saturated for the rest of the day. It evaporated/soaked in really quickly, so I probably sprayed it down three times between 4pm and 11pm. OA temps were about 85* and it was hot and humid inside the building for sure!
dq2igw.jpg


Came back in the morning to sawcut control joints.
2804p3s.jpg

5kfw3p.jpg


Crappy shot of the second half of the payment. :scared: :eek:
ek401i.jpg


Waited a week before pulling any cars in, and my Cummins still hasn't actually been inside. Knocked up some shelves in the meantime for company materials and moved a metal shelf and the **** on it out of the wife's woodshop/garage. It's amazing what a difference a usable floor makes as far as making the building useful.
21ec18i.jpg

dfeyk5.jpg


Had to have a small photoshoot with the pretty car in the completely empty shop. :D
k1b6tc.jpg

mug7qc.jpg


That's a funny-looking Ford....
29wpjr6.jpg


Not bad for an $800 car.
1jpv5y.jpg

124hg21.jpg


Still have some minor water entry issues under the door. :( I haven't put the door latch on yet, though, to cram the bottom weatherstrip down against the slab, so I'm not super concerned about it at this point. And I got a curved floor squeegee so a few strokes and it's gone, rather than putting a fan on it and waiting three days for the mud to dry. :D
wk2wdk.jpg


A couple of weeks ago, I threw up some pipe and fixtures to light the overhang.
2d0125k.jpg

jhq06w.jpg

25yzzao.jpg


Three-way switches at either end and four GFCI-protected outdoor receps on each end as well. LED flood-style bulbs in each fixture. Very usable light, and it really makes that overhang come alive at night.
2cyozo.jpg

2enxojq.jpg


That's about where it sits currently. I did some more conduit rough-in inside for the rest of the overhead lighting, but I need to order up ballasts for the rest of the fixtures to be able to hang them. The two halves of the building are on two three-way switches, one pair at each walk door, so there's not much left to do once the lights are up. Between that, more receptacles throughout, and a big circuit for my compressor, that's the gist of what remains for electrical. I need to do a a wireless internet bridge from the house and a wireless router inside the shop so I can get internet without having a door open, but that's still a little ways out.

Let me know what you think!
 

65cayne

Well-known member
Joined
Sep 26, 2010
Messages
216
Location
Oklahoma
Wow....all that in two posts. Awesome story, congrats on the marriage, your neighbor is awesome, good work on the electrical, now my future garage needs to be upsized.

So Hanson delivered everything you needed and you knew how it would look before it went up? Instructions included? Did you price out materials yourself and compare? Heat in the winter? Gotta get cold on the Co plains no?
 
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
Yeah, maybe I should have spaced it out a little, but I get rolling with uploading pics and writing. :) How big are you thinking for your future garage? GO BIGGER.

Yep, they delivered it as I spec'd out. The walk door in the front is 4' wide, and the engineered drawings reflected the column spacing, framing, etc, to accommodate that. That came from a suggestion from my neighbor as well, as he did a 4' door on one of his barns, and it was well worth doing. I love having the extra width. Everything else I kinda ballparked, like the location of the rear walk door under the overhang, but it turned out well and it was a very complete package. It wasn't the cheapest but I'm happy with it.

Haven't figured out heat yet. I have a spare woodstove that I've had kicking around for years but never used, and I already heat with wood a lot, but I don't know where I'd put it, if I can insure for it, or if it would be adequate. The building is pretty well ventilated and not heavily insulated, so I don't know that I can even heat it effectively at this point. My other neighbor has a small stove in his hangar that's comparably sized to my building, but I need to make it over there when it's cold and he's got it running before I try to duplicate that setup.
 

tomralph

Well-known member
Joined
Dec 16, 2016
Messages
105
Location
Colorado Front Range
Awesome building. Who did your concrete I am not too far from you and looking for about 1900 sq ft of mud to be slung in my building. Thanks!
 

keduner

Well-known member
Joined
Oct 16, 2010
Messages
272
Location
Parker Colorado
Great looking building, congratulations. I live in Elbert County too, but with a Parker address. My building is much smaller, 30X40X14. Wish I had gone bigger! Regards,
leGm8wB.jpg
 
Last edited:
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
Awesome building. Who did your concrete I am not too far from you and looking for about 1900 sq ft of mud to be slung in my building. Thanks!

Forgot to check back in on this, whoops. If you didn't already do this, I used Chase Kolberg of Complete Koncrete out of Peyton. Didn't have a problem coming out this far or lining up the mud to do the same, which can be problematic with contractors who are accustomed to working in town.
 
OP
A

Asha'man

Member
Joined
Aug 1, 2011
Messages
14
Location
Elbert County, CO
Great looking building, congratulations. I live in Elbert County too, but with a Parker address. My building is much smaller, 30X40X14. Wish I had gone bigger! Regards,
leGm8wB.jpg

You must be up by Delbert/Singing Hills area. Nice area. I think we always wish we'd gone bigger! Even I do!
 
To avoid these ads, REGISTER NOW!
Top Bottom