It's been a couple of weeks since my last update.
The floor was poured on 10/31/07. The ridge vent was installed along with all the windows and the lockset in the mandoor. The siding is getting delivered Tuesday 11/13/07 and the garage door is going in Thursday 11/15/07. Not sure when I'll start the siding, but I'm hoping it will get installed without having to wait until spring.
floor:
roof:
window:
more pics are here or click the link in sig for the whole build:
http://www.geocities.com/lobotie/Garage/garage7.html
The floor was poured on 10/31/07. The ridge vent was installed along with all the windows and the lockset in the mandoor. The siding is getting delivered Tuesday 11/13/07 and the garage door is going in Thursday 11/15/07. Not sure when I'll start the siding, but I'm hoping it will get installed without having to wait until spring.