Got my variance the begining of June for my 28X28 detached garage with a half storage loft above. Needed a variance as I am on a corner lot in arg. zoning. Town gave the ok for 10ft from property line instead of 60ft. Decided on Circle B barn co. in Lancaster, MA for the design and build. Survey got done mid Sept. Got building permit in mid Oct. Hired my own excavator and electrican. Excavator came on Nov 3rd.
 

Attachments

  • 2012-11-03_14-21-40_509 - Copy (800x600) (640x480) (500x375) (400x300).jpg
    2012-11-03_14-21-40_509 - Copy (800x600) (640x480) (500x375) (400x300).jpg
    143.1 KB · Views: 253
  • 2012-11-03_14-23-46_667 (400x300).jpg
    2012-11-03_14-23-46_667 (400x300).jpg
    26.2 KB · Views: 211
  • 2012-11-03_15-06-53_528 (400x300).jpg
    2012-11-03_15-06-53_528 (400x300).jpg
    133.3 KB · Views: 199
Last edited:
To avoid these ads, REGISTER NOW!
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Nov 12th dug for footing and frost walls.
 

Attachments

  • 2012-11-12_13-41-00_279 (400x300).jpg
    2012-11-12_13-41-00_279 (400x300).jpg
    26.7 KB · Views: 125
  • 2012-11-12_13-37-11_894 (400x300).jpg
    2012-11-12_13-37-11_894 (400x300).jpg
    118.7 KB · Views: 115
  • 2012-11-12_13-37-06_447 (400x300).jpg
    2012-11-12_13-37-06_447 (400x300).jpg
    120.6 KB · Views: 110
  • 2012-11-12_13-16-16_16 (400x300).jpg
    2012-11-12_13-16-16_16 (400x300).jpg
    141.7 KB · Views: 116
  • 2012-11-12_13-10-21_659 (400x300).jpg
    2012-11-12_13-10-21_659 (400x300).jpg
    137.3 KB · Views: 131
  • 2012-11-12_13-10-14_554 (400x300).jpg
    2012-11-12_13-10-14_554 (400x300).jpg
    136.5 KB · Views: 136
  • 2012-11-12_13-09-48_290 (400x300).jpg
    2012-11-12_13-09-48_290 (400x300).jpg
    134.3 KB · Views: 157
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Couple more pics.
 

Attachments

  • 2012-11-12_13-41-10_529 (400x300).jpg
    2012-11-12_13-41-10_529 (400x300).jpg
    26.6 KB · Views: 91
  • 2012-11-12_13-41-15_975 (400x300).jpg
    2012-11-12_13-41-15_975 (400x300).jpg
    142.2 KB · Views: 84
  • 2012-11-12_15-52-17_37 (400x300).jpg
    2012-11-12_15-52-17_37 (400x300).jpg
    129.6 KB · Views: 111
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Nov 17th forms going in. Noticed the front forms were wrong so I left the plans and they fixed before the pour.
 

Attachments

  • 2012-11-17_09-05-30_152 (400x300).jpg
    2012-11-17_09-05-30_152 (400x300).jpg
    134.8 KB · Views: 129
  • 2012-11-17_09-05-10_656 (400x300).jpg
    2012-11-17_09-05-10_656 (400x300).jpg
    134.7 KB · Views: 137
  • 2012-11-17_09-04-53_104 (400x300).jpg
    2012-11-17_09-04-53_104 (400x300).jpg
    112.9 KB · Views: 149
  • 2012-11-17_09-04-33_583 (300x400).jpg
    2012-11-17_09-04-33_583 (300x400).jpg
    126.6 KB · Views: 149
  • 2012-11-17_09-04-25_304 (300x400).jpg
    2012-11-17_09-04-25_304 (300x400).jpg
    122.4 KB · Views: 148
  • 2012-11-17_09-04-09_6 (400x300).jpg
    2012-11-17_09-04-09_6 (400x300).jpg
    131.9 KB · Views: 151
  • 2012-11-17_09-04-01_702 (400x300).jpg
    2012-11-17_09-04-01_702 (400x300).jpg
    131.9 KB · Views: 165
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
More pics.
 

Attachments

  • 2012-11-18_15-52-00_511 (400x300).jpg
    2012-11-18_15-52-00_511 (400x300).jpg
    122.6 KB · Views: 113
  • 2012-11-18_15-51-52_307 (400x300).jpg
    2012-11-18_15-51-52_307 (400x300).jpg
    121.1 KB · Views: 102
  • 2012-11-17_09-06-31_92 (400x300).jpg
    2012-11-17_09-06-31_92 (400x300).jpg
    121 KB · Views: 110
  • 2012-11-17_09-06-17_452 (300x400).jpg
    2012-11-17_09-06-17_452 (300x400).jpg
    128.9 KB · Views: 122
  • 2012-11-17_09-05-57_223 (400x300).jpg
    2012-11-17_09-05-57_223 (400x300).jpg
    135.1 KB · Views: 111
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Couple of pics of the footing pour. My son loved watching the cement truck.
 

Attachments

  • Mail-Attached (3).jpg
    Mail-Attached (3).jpg
    70.7 KB · Views: 166
  • Mail-Attached-1.jpg
    Mail-Attached-1.jpg
    76.9 KB · Views: 186
  • DSC05036 (400x300).jpg
    DSC05036 (400x300).jpg
    138.8 KB · Views: 158
  • DSC05038 (400x300).jpg
    DSC05038 (400x300).jpg
    136.8 KB · Views: 158
  • DSC05035 (300x400).jpg
    DSC05035 (300x400).jpg
    138.2 KB · Views: 144
  • DSC05030 (400x300).jpg
    DSC05030 (400x300).jpg
    130.5 KB · Views: 164
Last edited:
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Forms removed and backfilled Nov 22nd. The 2 four inch holes in foundation are for the electrical runs. Nov 30th, electrical trench and conduit approval.
 

Attachments

  • 2012-11-22_10-02-19_197 (400x300).jpg
    2012-11-22_10-02-19_197 (400x300).jpg
    135.3 KB · Views: 187
  • 2012-11-22_10-02-13_145 (300x400).jpg
    2012-11-22_10-02-13_145 (300x400).jpg
    138 KB · Views: 180
  • 2012-11-22_10-01-58_806 (400x300).jpg
    2012-11-22_10-01-58_806 (400x300).jpg
    128.9 KB · Views: 196
  • 2012-11-22_10-01-50_313 (400x300).jpg
    2012-11-22_10-01-50_313 (400x300).jpg
    129.1 KB · Views: 196
  • 2012-11-22_10-01-25_599 (400x300).jpg
    2012-11-22_10-01-25_599 (400x300).jpg
    142.5 KB · Views: 205
  • 2012-11-22_10-00-48_879 (400x300).jpg
    2012-11-22_10-00-48_879 (400x300).jpg
    108.8 KB · Views: 197
  • 2012-11-22_10-00-38_244 (400x300).jpg
    2012-11-22_10-00-38_244 (400x300).jpg
    118.1 KB · Views: 177

CNGsaves

Well-known member
Joined
Sep 26, 2012
Messages
13,233
Location
KS and OK
Nice looking foundation so far. Like the pours that already have the sill bolts already installed in concrete.

Got any plans/drawings that you can post so we can see what's coming?
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Front and side views. Floor was poured on Dec 6th.
 

Attachments

  • front (500x257).jpg
    front (500x257).jpg
    109 KB · Views: 290
  • side (500x344).jpg
    side (500x344).jpg
    114.6 KB · Views: 229
  • 2012-12-08_13-33-34_903 (2) (400x300).jpg
    2012-12-08_13-33-34_903 (2) (400x300).jpg
    125.9 KB · Views: 281
  • 2012-12-08_13-33-41_308 (2) (400x300).jpg
    2012-12-08_13-33-41_308 (2) (400x300).jpg
    123.3 KB · Views: 237
  • 2012-12-08_13-33-52_354 (2) (400x300).jpg
    2012-12-08_13-33-52_354 (2) (400x300).jpg
    136.2 KB · Views: 240
  • 2012-12-08_09-33-33_253 (400x300).jpg
    2012-12-08_09-33-33_253 (400x300).jpg
    135.2 KB · Views: 227
  • 2012-12-08_09-33-40_136 (400x300).jpg
    2012-12-08_09-33-40_136 (400x300).jpg
    135.7 KB · Views: 220
Last edited:

Kalstar

Well-known member
Joined
Sep 20, 2011
Messages
85
Location
Cape Cod MA
So $31,300 for the garage without foundation and floor? Without them building it is should be around 15K for the kit. Is that about right?
 

Cemoto

Well-known member
Joined
Aug 26, 2012
Messages
427
Location
Central Massachucetts
Looks like great soil to work with.

I'm dealing with the conservation committee now as there is woodland marsh within 100 ft of my 30x40 proposed build. 200ft of silt fence and 71 hay bales (double staked) on level land, yes that's right two stakes per hay bale on level land.

Thanks for posting the numbers.

How thick is the floor?

Regards,
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Looks like great soil to work with.

I'm dealing with the conservation committee now as there is woodland marsh within 100 ft of my 30x40 proposed build. 200ft of silt fence and 71 hay bales (double staked) on level land, yes that's right two stakes per hay bale on level land.

Thanks for posting the numbers.

How thick is the floor?

Regards,

Soil worked out great. Alot of ledge in my town but we did not hit any and only 1 large boulder. The floor is 4" 3500psi
 
Last edited:

RaysnCayne

Well-known member
Joined
Apr 12, 2011
Messages
194
Location
Richmond, VA
28x28 detached. That's my kinda garage. ;)

Seems a bit pricey to me at first glance. But considering you don't have to lift a finger and you've got a lot more concrete going in than I had to pour, the price turns out to be fairly reasonable.

Looks like it's gonna be a really nice garage. I'm eager to see how you finish it out.

BTW, bigger pics please! More like 640x480 or 800x500 pixels.
 
Last edited:
To avoid these ads, REGISTER NOW!
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
28x28 detached. That's my kinda garage. ;)

Seems a bit pricey to me at first glance. But considering you don't have to lift a finger and you've got a lot more concrete going in than I had to pour, the price turns out to be fairly reasonable.

Looks like it's gonna be a really nice garage. I'm eager to see how you finish it out.

BTW, bigger pics please! More like 640x480 or 800x500 pixels.

The town put a height restriction on my garage of 21' during the variance request which pushed the price up also. If I got 25' could have done things more standard.
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Framing materials should have been delivered yesterday but did not. No phone call or email as to why. This has become the norm with these guys even though I asked for a call or email if nothing was going to get done on a scheduled day.:mad:
 

M-technik-3

Well-known member
Joined
Feb 16, 2008
Messages
1,785
Location
Western Mass
Framing materials should have been delivered yesterday but did not. No phone call or email as to why. This has become the norm with these guys even though I asked for a call or email if nothing was going to get done on a scheduled day.:mad:

Sorry to hear of your difficulties. 21' wow that's pretty restrictive, did they give a reason for that. It's not like you live in Lexington or Concord where they zone you to death.
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Sorry to hear of your difficulties. 21' wow that's pretty restrictive, did they give a reason for that. It's not like you live in Lexington or Concord where they zone you to death.

The only real reason was that I have a ranch house that the garage is going next to. One of the guys on the planning board must have done some building in the past and was rattling off numbers said 21' would be plenty. Another planning board member even suggested add a couple more feet just in case but the first guy would not. When I asked if I got plans that needed a couple more feet what I would need to do was told I would have to come back in front of planning board to request. More $ and time for that. I guess 4 more feet would have turned it into an eye sore. :headscrat
Just heard from my wife that materials showed up this morning. Guess these guys would rather have me pissed all night than make a 1 minute phone call. Snow and rain in the forecast for next week so we will see when some framing starts.
 

46Nash

Well-known member
Joined
Jul 20, 2010
Messages
171
Location
NY
Damn I thought I might be paying too much for my garage but this definetely put me at ease. Awesome.

Nice build cant wait to see the finished product.

As for the scheduling, my deliveries have been on time but my contractor is definetely taking his sweet time finishing. We broke ground Sept 14th and at this point I only have half my siding up and no garage doors for atleast 3 weeks. I dont think they have any other jobs, except for another garage after mine, so just think they arent rushing since winter is slow. Oh well.
 
Last edited:

gregp

Active member
Joined
Sep 17, 2009
Messages
31
Location
Ma
Did you sub out the excavation and cement work or did Circle B sub it themselves? Who did they use for it? I'm thinking of doing something similar in the spring so i am following this with alot of interest.
Thanks
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Did you sub out the excavation and cement work or did Circle B sub it themselves? Who did they use for it? I'm thinking of doing something similar in the spring so i am following this with alot of interest.
Thanks

I did sub out the excavation. It was done by Steve Glidden, Glidden excavation, Hopkinton MA. Highly recommend him. I let Circle B handle the cement work. Tresca bros concrete did the pour on the foundation.The crew that did the framing for the pour was out of Bellingham, DA concrete( Dennis Anderson). A different crew did the floor. I was not there when they did the floor so did not get there name.
 

gunselman

New member
Joined
May 21, 2011
Messages
2
Our maximum height is 20' or no taller than the primary structure. So i understand the height issue.
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Our maximum height is 20' or no taller than the primary structure. So i understand the height issue.

Mine will be 20' 6" when done. One thing I wanted was to be able to put in a 4 post lift down the line. So the upstairs is only on the right half of the garage. The left half will not have a second floor so there will be plenty of height. To get a 12' or higher ceiling I would have needed around 24 or 25' total height. Giving up storage space above but can have 3 car parking with a 4 post lift.
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
Framing started on 12/20
 

Attachments

  • 2012-12-22_framing (640x480).jpg
    2012-12-22_framing (640x480).jpg
    62.7 KB · Views: 196
  • 2012-12-22_framing1 (640x480).jpg
    2012-12-22_framing1 (640x480).jpg
    63.5 KB · Views: 164
  • 2012-12-22_framing2 (640x480).jpg
    2012-12-22_framing2 (640x480).jpg
    59.4 KB · Views: 201

T.Read

Member
Joined
Dec 12, 2009
Messages
10
Location
Nashville, TN
You're lucky. I talked to codes for my neighborhood in Nashville a few weeks ago to see what I can get away with to build mine and I can't go higher than 16'!
 
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
More framing on Dec 28th. pics taken on the 30th after shoveling out 8 inches of snow.
 

Attachments

  • 2012-12-28-1.jpg
    2012-12-28-1.jpg
    64 KB · Views: 116
  • 2012-12-28-2.jpg
    2012-12-28-2.jpg
    128.2 KB · Views: 108
  • 2012-12-28-3.jpg
    2012-12-28-3.jpg
    55.8 KB · Views: 102
  • 2012-12-28-4.jpg
    2012-12-28-4.jpg
    56.6 KB · Views: 95
  • 2012-12-28-5.jpg
    2012-12-28-5.jpg
    54.5 KB · Views: 91
  • 2012-12-28-6.jpg
    2012-12-28-6.jpg
    64.2 KB · Views: 98
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
More framing Jan 1st-3rd.
 

Attachments

  • DSC05231 (640x480).jpg
    DSC05231 (640x480).jpg
    63.8 KB · Views: 158
  • DSC05232 (640x480).jpg
    DSC05232 (640x480).jpg
    62 KB · Views: 148
  • DSC05233 (640x480).jpg
    DSC05233 (640x480).jpg
    61.9 KB · Views: 134
  • DSC05234 (640x480).jpg
    DSC05234 (640x480).jpg
    63.7 KB · Views: 163
  • DSC05235 (640x480).jpg
    DSC05235 (640x480).jpg
    64.3 KB · Views: 152
  • DSC05236 (640x480).jpg
    DSC05236 (640x480).jpg
    63.7 KB · Views: 218
  • DSC05237 (640x480).jpg
    DSC05237 (640x480).jpg
    56.7 KB · Views: 165
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
more
 

Attachments

  • 2013-01-05_13-11-28_778 (2) (480x640).jpg
    2013-01-05_13-11-28_778 (2) (480x640).jpg
    48.3 KB · Views: 166
  • 2013-01-05_13-11-39_527 (2) (600x800).jpg
    2013-01-05_13-11-39_527 (2) (600x800).jpg
    86.2 KB · Views: 127
  • DSC05238 (640x480).jpg
    DSC05238 (640x480).jpg
    57 KB · Views: 120
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
2 more
 

Attachments

  • 2013-01-05_13-12-05_288 (2) (800x600).jpg
    2013-01-05_13-12-05_288 (2) (800x600).jpg
    83.5 KB · Views: 112
  • 2013-01-05_13-12-14_950 (2) (800x600).jpg
    2013-01-05_13-12-14_950 (2) (800x600).jpg
    89.1 KB · Views: 141
OP
6

66coronet500

Well-known member
Joined
Mar 23, 2012
Messages
67
Location
Hopkinton, MA
pics from jan 5th
 

Attachments

  • DSC05241 (600x800).jpg
    DSC05241 (600x800).jpg
    62.3 KB · Views: 103
  • DSC05242 (800x600).jpg
    DSC05242 (800x600).jpg
    71.4 KB · Views: 132
  • DSC05243 (600x800).jpg
    DSC05243 (600x800).jpg
    42.9 KB · Views: 124
  • DSC05244 (600x800).jpg
    DSC05244 (600x800).jpg
    48.6 KB · Views: 111
  • DSC05245 (600x800).jpg
    DSC05245 (600x800).jpg
    64.6 KB · Views: 109
  • DSC05246 (800x600).jpg
    DSC05246 (800x600).jpg
    61.3 KB · Views: 103
  • DSC05240 (800x600).jpg
    DSC05240 (800x600).jpg
    73.9 KB · Views: 127
To avoid these ads, REGISTER NOW!
Top Bottom