I talked to an epoxy company today and they said that some of their installers will fill holes, big pits, and cracks with Liquid Nails. They just wait for the dry time on the tube and then cover the whole thing with the epoxy. I asked how long it holds up and they said there never was a problem. Has anyone tried this?
